Rebuilding the infrastructure of California’s 5th largest water district involved filling more than three miles of 12” abandoned water lines. The lengths of pipe to be filled ranged from 1,000 to 3,500 feet.
Geofill LD Class II was used because -- unlike CDF or sand cement slurry -- this flowable material can be pumped distances of up to one mile at low pressures without requiring multiple access points.